summaryStorefront rebuild sprint from Scrums.com — fixed-scope e-commerce replatform with conversion-focused UX, PCI-compliant checkout, and sub-2-second loads.🔒 Sign in for pricing·★ 5.0·● available now·vetted by Scrums.com

delivery · CAT-30030649 · rev 1.0

Storefront Rebuild Sprint. @storefront-rebuild

Deliverydelivery · outcome-driven-sprints · ecommerce · replatformScrums.com● available now

Part of Application Modernization Services

5.0Reviews ▾

Rated 5.0 / 5 by clients on GoodFirms.

Read verified reviews on GoodFirms →

Vetted by Scrums.com Platform

Provider Scrums.com

Last review 2026-08-13

01

What you get

the numbers that matter
Ready in

≈ 2 weeks

signed to first PR

Retention

96%

engagements renewed

Match

96%

to your stack & domain

A fixed-scope rebuild or replatform of one e-commerce storefront: conversion-focused UX, streamlined checkout with PCI-compliant payments, catalog and order integration, and sub-2-second page loads.

02

How this operator works

every way of working, already decided
A · capability focus

Owns the system, not the ticket

Takes end-to-end ownership of a service or surface. Design, delivery, on-call. And is measured on outcomes, not hours.

B · ways of working

Embedded, async-first, instrumented

Works inside your repos, your CI and your rituals. Daily written standups, decisions logged. No status-meeting tax.

C · reliability posture

Runbooks, canaries, reversible deploys

Every change gated and reversible. Incidents get a timeline and a postmortem; nothing ships without a rollback.

D · comms & cadence

Plugged into your Slack & rituals

Joins standups and retros, reports weekly against the goal. You get an operator, not a queue.

E · tooling

Brings a pre-wired stack or adopts yours

Infrastructure and observability as code by default. No bespoke setup tax to absorb.

F · onboarding

Scoped, gated, reversible

Week-1 shadow, week-2 ownership, swap on request inside the trial window. No long-tail handover risk.

·

Overview

The Storefront Rebuild Sprint replaces or replatforms one e-commerce storefront on a fixed scope — built to convert browsers into buyers, whether you're a DTC brand, a B2B wholesale operation, or complex retail. The build runs on a modern stack (React, Next.js, Node.js), headless where that fits, with a phased cutover instead of a big-bang launch.

Performance is treated as revenue: the sprint targets sub-2-second page loads because every 100ms improves conversion by roughly 1%, and checkout is engineered specifically to cut abandonment.

·

What's included

Conversion-Focused UX

Storefront design optimized for the buying journey across devices — category, product, cart — informed by your analytics, not templates.

Checkout & Payments

A streamlined checkout with Stripe, PayPal, Square, or enterprise processors, PCI-compliant, built to reduce abandonment step by step.

Catalog & Order Integration

Product catalog with advanced filtering, inventory sync, and order flow integrated with fulfillment and shipping providers (FedEx, UPS).

Performance Tuning

Sub-2-second load targets, measured and hit — image pipelines, caching, and rendering strategy tuned before launch, with GA4 wired in.

·

How it works

  1. Scope — Strategy and discovery: current-platform audit, conversion data review, and a fixed rebuild scope with migration plan.
  2. Build — Design and development in two-week sprints — storefront, checkout, integrations — with testing and performance optimization throughout.
  3. Handover — Phased cutover with SEO preserved, launch support, and a documented handover of the new storefront.
·

Part of every Delivery Plan

The Storefront Rebuild Sprint is a menu item on the Scrums.com delivery catalog, available at every plan tier. Add it to your plan backlog and your delivery team schedules it like any other item — scoped, tracked, and reported through the SEOP. See Delivery Plan Tiers.

·

FAQs

Will the migration take the store down?

No. Cutover is phased: the new storefront runs alongside the old one, traffic moves progressively, and rollback stays available until the numbers prove out. Revenue does not pause for the rebuild.

What happens to our SEO?

URL mapping, redirects, and structured data are part of the migration scope. Rankings are an asset the rebuild is required to preserve, and they're monitored through cutover.

What if we want to keep improving conversion after launch?

That's what the Commerce Engineering Pod is for — ongoing feature, integration, and conversion work on the same storefront, scheduled from your plan backlog.

03

What's included

in every engagement · no add-ons
✓Conversion-Focused UXincl.
✓Checkout & Paymentsincl.
✓Catalog & Order Integrationincl.
✓Performance Tuningincl.
04

Track record

deployments on real systems · anonymized
SectorSystemOutcomeSpanStatus
Fintechpayments-core ledger99.97% achieved14 mo● complete
Commercecheckout platform−38% incident rate9 mo● complete
Health SaaSdata plane0 SEV1 in 6 mo11 mo● active
Logisticsrouting enginezero-downtime cutover7 mo● complete
AI infrainference clusterp99 −120 ms5 mo● active
05

Works inside your stack

surfaces this operator binds to
SurfaceBindingDirectionAuth
Source controlgithub.com/<org>reviews + writesOIDC
CI / CDscm-flow · deploy-servicegates deploysOIDC
Observabilityotlp://collector:4317metrics + alertsmTLS
Commsslack://<workspace>standups, incidentsSSO
Secretsvault://scrums/op/<id>short-lived credsSPIFFE
On-callpagerduty://<org>primary / secondaryAPI token
06

Boundaries

what to deploy instead

Scoped to this discipline. For an adjacent capability, compose a second operator into the squad. compose →

Not a fractional advisory engagement. For advisory-only, contact platform@scrums.com.

07

Deployments

the only social proof we publish

402deploys

across 38 organizations

+24 last 30 days · median age 11.4 mo · retention 96%

08

Pricing

one number · one footnote
billed monthly

🔒 Sign in for pricing

Available at all Delivery Plan Tiers →

All-in: the operator, delivery manager and replacement guarantee. No recruiter fee, no markup surprises.

Final pricing computed at deploy from your committed envelope, region and account tier.

·

FAQ

common questions
How is Storefront Rebuild Sprint priced?

Pricing is shown to signed-in accounts. Sign in to view the rate; pricing is computed from your engagement scope, region and account tier.

Is Storefront Rebuild Sprint available now?

Yes. It is published and deployable directly from the Scrums.com catalog.

Can a Storefront Rebuild Sprint deployment be reversed?

Yes. Deployments are reversible with a one-click swap inside the trial window.

Who provides Storefront Rebuild Sprint?

Scrums.com, vetted by the Scrums.com platform.

·

How it compares

vs other delivery
OptionFromStackStatus
Storefront Rebuild Sprint · this one🔒 Sign in for pricingdelivery · outcome-driven-sprints · ecommerce● available
Codebase Quality Audit🔒 Sign in for pricingdelivery · code-audit · maintenance● available
Product Discovery Sprint🔒 Sign in for pricingdelivery · discovery · workshop● available
Clickable Product Prototype🔒 Sign in for pricingdelivery · prototyping · design● available
09

Commonly deployed with

more delivery

More delivery

Codebase Quality Audit

Keep your applications at peak performance with proactive maintenance. From bug fixes to security checks and updates, we ensure reliability, uptime, and long-term scalability.

All plan tierscode-auditmaintenancesecurity
See options →

Product Discovery Sprint

Lay the foundation for successful projects with structured workshops designed to align stakeholders, define goals, and create a clear product roadmap in as little as 1 week.

All plan tiersdiscoveryworkshopproduct-strategy
See options →

Clickable Product Prototype

Transform ideas into tangible prototypes in as little as 2 weeks. Validate concepts, refine features, and align stakeholders — all before committing to full development.

All plan tiersprototypingdesignvalidation
See options →
billed monthly

🔒 Sign in for pricing

Deliver this scope

Run this scope on your Delivery Plan

Core costs Was $8,000£6,700R140,000 now $4,500£3,750R79,000/month for one active workstream. Your scope sets the delivery schedule and the total cost. You can use the same plan for your other development work.

Add this scope to your backlog. Your delivery owner confirms the scope with you, and the team delivers it.

Delivery Plan · Core

One plan for your software backlog.

Now $4,500£3,750R79,000/ monthWas $8,000£6,700R140,000
One active workstream. Managed delivery.
Start your Delivery Plan →
Billed monthly · excl. VAT/sales tax · onboarding starts immediately after checkout
Included every month
Delivery owner. One accountable owner scopes this work and runs the team that delivers it.
One backlog across your development priorities. You set the order; requests are scoped and delivered one workstream at a time.
Visibility. Milestones agreed up front. Progress, pull requests and releases live on the Scrums.com Platform.
Ownership. Code, data and documentation are yours from day one, with handover included.

Work is scoped and delivered within your plan’s capacity. Priorities can change; additional parallel workstreams require more capacity.

First-month benefits
14DAYS
First-delivery guaranteeYour first agreed deliverable ships within 14 days of scope and access being confirmed, or your first month is free.
$500 in AI infrastructure catalog creditsMONTH 1
Annual-plan benefits$10,000 in specialist services
Technical Assessment & Delivery RoadmapWe review your systems, rank your priorities and agree the first deliverable.
CI/CD & Quality Pipeline SetupYour pipelines, environments and quality checks, set up and handed over to you.
You buy monthly delivery capacity, not a fixed project price. Infrastructure usage and third-party services are billed separately. Full Delivery Plan coverage and terms →
Need a custom implementation? Get an Enterprise quote →
Day 0Scope and access confirmedOnboarding starts at checkout. You confirm the scope and share repos and environments.
Within 48 hoursFirst code in productionFirst change merged and deployed through your pipeline.
Within 14 daysFirst agreed deliverable shipsThe first milestone of this scope, agreed in writing.
If it does not shipYour first month is freeYou do not pay for month one.
The first deliverable is agreed in writing before the clock starts. The clock starts when scope and access are confirmed. Applies to the first deliverable on a new plan.Read the full Delivery Plan terms →